Two flats of the same size can quote several times apart. The difference is not the hourly rate — it is the scope, the material grade and how detailed the quotation is. This page explains how we price.
Renovation cost is not a fixed rate multiplied by floor area. These six points are what actually separate one quote from another:
Most renovation disputes start with a vague quotation. A quotation you can compare and enforce lists each trade with quantity, unit, material brand and model — not a single line reading "masonry" against a lump sum.
Our quotations separate masonry, plumbing and electrical, carpentry, painting, furniture and sundries, and mark which items are essential and which are optional, so the budget can be adjusted deliberately.
Three things work: confirm the actual condition of the flat at measurement stage; specify materials and quantities in writing; and set out in the contract how variations are priced and approved.
We list every known issue before work starts. If a concealed problem emerges during construction, we quote it and wait for your approval before proceeding.
A rough indication, yes, but not a reliable figure. Quotes given without inspection and measurement tend to miss concealed works and site constraints, and are revised later.
On-site measurement and an initial quotation are free in Hong Kong, with no minimum spend and no charge if you decide not to proceed.
Typically on signing, at commencement, at mid-point and on completion, with percentages and milestones written into the contract. We do not ask for the full sum up front.